ARC-01, our first compute asset at BASTION MX-1, is designed to deliver high-density AI infrastructure with dedicated power, advanced cooling, and modular expansion from an initial 25 MW to 200 MW of IT capacity.
Reference Design
ENGINEERED FOR PERFORMANCE.
- ~370 × 110 MBuilding footprint, ~40,700 m²
- ~26.04 MWGross electrical load per 25 MW IT zone
- A/B + UPSDual-path power architecture
- 8 × 25 MWCompute zones, 200 MW IT
- DIRECT-TO-CHIPLiquid cooling, dry coolers, backup chillers
- REDUNDANT FIBERHigh-capacity, diverse paths targeted
- 25 MW ITPhase 1, N-1 redundancy
- 01FOOTPRINT
- 02POWER
- 03DISTRIBUTION
- 04COMPUTE
- 05COOLING
- 06FIBER
- 07PHASE 1
WHAT MAKES ARC-01 WORK
01 — FASTER DEPLOYMENT
Power, equipment, and construction aligned to accelerate delivery.
02 — LOWER COSTS
Shared infrastructure and regional sourcing to reduce development costs.
03 — NEXT-GEN AI
High-density power and liquid cooling designed for NVIDIA Vera Rubin–class systems.
04 — SIMPLER OPERATIONS
We manage the infrastructure. You focus on compute.
05 — BUILT TO SCALE
Start at 25 MW IT. Expand toward 200 MW.
06 — PREDICTABLE SERVICES
Long-term leases, metered energy, and managed facilities.
WHAT MAKES
ARC-01 WORK.
01 — POWERED SHELL
Purpose-built data halls with dedicated power generation and electrical distribution.
02 — ADVANCED COOLING
Direct-to-chip liquid cooling, dry coolers, and backup chilling systems.
03 — FIBER CONNECTIVITY
Facility infrastructure designed for high-capacity network connections.
04 — MODULAR CAPACITY
200 MW IT reference design divided into eight 25 MW operating zones.
- 200 MWIT CAPACITY
- 8 × 25 MWCOMPUTE ZONES
- 25 MWFIRST PHASE
- ~40,700 m²BUILDING FOOTPRINT